Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Replace Subsoil&Topsoil <br /> Site: Big"G"Gravel Pit Permit Action: ANM 23 Inspection Permit/Job#: M2006081 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 3/10/2023 County: Pueblo Filename: M081-005 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA 50 50 NA <br /> Ownership cost/hour: $264.49 NA NA $124.85 $114.80 NA <br /> Operating cost/hour: $296.10 NA NA $48.82 $39.70 NA <br /> %Utilization-ripper: NA NA NA 100 100 NA <br /> Ripper own. cost/hour: NA NA NA $13.10 $5.34 NA <br /> Ripper op. cost/hour: NA NA NA $7.30 $3.98 NA <br /> Operator cost/hour: $47.07 NA NA $40.04 $46.87 NA <br /> Unit Subtotals: $607.66 NA NA $234.10 $210.69 NA <br /> Number of Units: 2 0 0 1 1 0 <br /> Group Subtotals: Work: $1,215.32 Support: $234.10 Maine $210.69 <br /> Total work team cost/hour: $1,660.11 <br /> MATERIAL QUANTITIES <br /> Initial volume: 61,710 CCY Swell factor: 1.115 <br /> Loose volume: 68,807 LCY <br /> Source of estimated volume: Appl: F-6"of Topsoil. Same for Overburden <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Loam Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br />