Laserfiche WebLink
BULLDOZER RIPPING WORK <br /> Task description: Rip Process Area <br /> Site: Big"G"Gravel Pit Permit Action: ANM 23 Inspection Permit/Job#: M2006081 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 3/8/2023 County: Pueblo Filename: Feb 2023 <br /> Inspection <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $124.85 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper Ownership Cost/Hour: $13.10 NA <br /> Ripper Operating Cost/Hour: $7.30 100 <br /> Operator Cost/Hour: $40.04 NA <br /> Total Unit Cost/Hour: $282.92 <br /> Total Fleet Cost/Hour: $282.92 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 6.00 acres Rip Depth(ft): 1.00 Volume: 9,680 BCY or CCY <br /> Source of estimated quantity: DRMS <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.56 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 250.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.789 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.789 Acres/hr <br /> Site Altitude: 4,450 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.65 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.65 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 9.16 Hours <br />