My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-29_REVISION - M2009074
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009074
>
2023-03-29_REVISION - M2009074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 9:22:33 AM
Creation date
3/30/2023 9:16:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009074
IBM Index Class Name
Revision
Doc Date
3/29/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Thomas Joseph Colorado Backhoe Service
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br /> Task description: Grade Mine Floor <br /> Site: The Orr Pit Permit Action: 2023 Inspection ANM Permit/Job#: M2009074 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 3/14/2023 County: Pueblo Filename: 003 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: CAT 140M Horsepower: 183 <br /> Ripper Attachment: Multi-Shank Ripper Shift Basis: I per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $75.87 NA <br /> Operating Cost/Hour: $53.81 100 <br /> Ripper Ownership Cost/Hour: $2.84 NA <br /> Ripper Operating Cost/Hour: $2.53 100 <br /> Operator Cost/Hour: $46.87 NA <br /> Total Unit Cost/Hour: $181.92 <br /> Total Fleet Cost/Hour: $181.92 <br /> MATERIAL QUANTITIES <br /> Total Area to be graded or ripped: 20.51 acres <br /> Source of estimated acreage: Application <br /> HOURLY PRODUCTION <br /> Average Grader Speed: 1.50 mph <br /> Selected Application: Finish grading(0-2.5 mph)- 1.5 <br /> Selected Blade Angle: 30 degrees <br /> Effective Blade Length: 10.40 feet <br /> Width of blade overlap per pass: 2.00 feet <br /> Net grading or ripping width per pass: 8.40 feet <br /> Unadjusted Hourly Unit Production: 1.5273 acres/hour <br /> Job Condition Correction Factors Site Altitude: 4630 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.85 (1sh/d, mod.) <br /> Net Correction: 0.8500 multiplier <br /> Adjusted Hourly Unit Production: 1.2982 acres/Hour <br /> Adjusted Hourly Fleet Production: 1.2982 acres/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 15.80 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.