My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-29_REVISION - M2009074
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009074
>
2023-03-29_REVISION - M2009074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2023 9:22:33 AM
Creation date
3/30/2023 9:16:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009074
IBM Index Class Name
Revision
Doc Date
3/29/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Thomas Joseph Colorado Backhoe Service
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mob/Demob of Reclamation Equipment <br /> Site: The Orr Pit Permit Action: 2023 Inspection ANM Permit/Job#: M2009074 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None <br /> Date: 3/14/2023 County: Pueblo Filename: 006 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/unit Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) fleet <br /> CatD8T-8 S U 53.08 $137.95 $136.92 1 $274.87 $136.92 $250.00 <br /> CAT 140M 16.68 $78.71 $68.22 1 $146.93 $68.22 $250.00 <br /> Subtotals: I $421.80 $205.14 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Power Mulcher(Bowie LD-90) $37.56 1 $37.56 $37.56 <br /> Drill/Broadcast Seeder with $13.99 1 $13.99 $13.99 <br /> Tractor <br /> Light Duty Pickup,4x4,3/4 T. $87.03 1 $87.03 $87.03 <br /> Subtotals: $138.58 $138.58 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: PUEBLO, CO <br /> Total one-way travel distance: 13.40 miles <br /> Average Travel Speed: 50.00 mph <br />
The URL can be used to link to this page
Your browser does not support the video tag.