Laserfiche WebLink
.t <br /> 1, 0,1, u <br /> Material consistency: 1.000 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 1.000 (DOZ-OC) <br /> Push gradient: 0.666 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.697 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.2890 <br /> Adjusted unit 231.20 LCY/hr <br /> production: <br /> Adjusted fleet 231.2 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.981/LCY <br /> Total job time: 6.19 Hours <br /> Total job cost: $1,403 <br />