Laserfiche WebLink
Nlobilization Worksheet Cont'd Task 4 06A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: NUCLA <br /> Total one-way travel distance: 20.00 miles <br /> Average Travel Speed: 30.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,151.52 <br /> `* two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost ** $58.75 <br /> ** one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> E uipment Equipment <br /> Haul Time(Hours): 0.67 0.67 <br /> Return Time(Hours): 0.67 0.67 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 2.33 1.33 <br /> JOB TIME AND COST <br /> Total job time: 4.67 Hours <br /> Total job cost: $2,210 <br /> C[RCES Cost Estimating Software <br />