My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-24_PERMIT FILE - M2022013 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022013
>
2023-03-24_PERMIT FILE - M2022013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2023 12:31:09 PM
Creation date
3/24/2023 12:22:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022013
IBM Index Class Name
Permit File
Doc Date
3/24/2023
Doc Name Note
Exhibit D - Extraction Plan
Doc Name
Adequacy Review Response
From
Raptor Materials, LLC
To
DRMS
Email Name
RDZ
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 23 <br /> 6.4.4 EXHIBIT D — Extraction Plan <br /> Initial Plant Site Theater as seen in Exhibit C-2: Extraction Plan Map <br /> With the exception of the wash pond, whose margins follow existing surface <br /> elevations; all plant site processing activities will occur on upland areas <br /> outside of the existing 100-year floodplain. These lands occur north and <br /> north-west of the existing Evans Ditch as it winds north of the Big Thompson <br /> River. <br /> Plant activities will require a wash plant and attending wash pond to recycle <br /> wash water and receive discharge silts and other reject fines from the washed <br /> product. Plant and Wash Pond areas are identified on Exhibit C-2: Extraction <br /> Plan Map. The wash pond will function as recycling wash water and receiving <br /> basin for reject fines for the intended Plant/Processing activities. Since the <br /> basin functions in a closed system, it will not require dewatering. <br /> Once the wash pond is established, wet plant operations can be created and <br /> join any dry plant activities in progress. Dry Plant operations can be readily <br /> established since water is not integral to their operations. Once established, <br /> wash pond water will function as a closed system. Settled materials from <br /> wash Ponds will be utilized as product or for reclamation as desired. <br /> Plant equipment will include, but is not limited to, a crusher, screens, and <br /> conveyors, scale house and scale, and attending equipment. Resulting <br /> stockpiles of pit run and processed products may be temporarily stockpiled <br /> here with processed stockpiles, or combined as needed, until transported to <br /> market. <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[112]CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.