My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-14_ENFORCEMENT - M1982121
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1982121
>
2023-03-14_ENFORCEMENT - M1982121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2023 8:30:08 PM
Creation date
3/21/2023 10:01:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
Enforcement
Doc Date
3/14/2023
Doc Name
BLM Correspondence
From
BLM
To
Rocky Mountain Industrials - RMR Agggregates, Inc.
Email Name
ACY
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENT OF <br /> P�M =_ r <br /> °tuou a u ro�.uww OMRM <br /> u <br /> b p United States Department of the Interior <br /> N O <br /> 7 � <br /> CH s �8°9 BUREAU OF LAND MANAGEMENT <br /> Colorado River Valley Field Office <br /> 2300 River Frontage Road <br /> Silt, CO 81652 <br /> March 7, 2023 �� <br /> In Reply Refer To: - , F <br /> 3809 (COG020) <br /> COC-074205 LIAR 14 2OZ3 <br /> CERTIFIED MAIL—7021 1970 0001 3799 5292 DIVISION OF RF-CLAMATION, <br /> RETURN RECEIPT REQUESTED MINING &SAFETY-MINERALS <br /> Rocky Mountain Industrials <br /> RMR Aggregates, Inc. <br /> Attention:Mr. Brian Fallin,CEO <br /> 6200 S. Syracuse Way, Suite 450 <br /> Greenwood Village, CO 80111 <br /> Dear Mr. Fallin: <br /> Thank you for the resubmittal of your Plan of Operations Modification for the Mid-Continent Quarry in <br /> response to the notice of noncompliance and the noncompliance order that BLM issued to Rocky Mountain <br /> Industrials(RMI)on August 30, 2022 ("enforcement orders"). The following public lands are affected by <br /> your proposed modification. <br /> Sixth Principal Meridian, Colorado <br /> T. 5 S.,R. 89 W., <br /> sec. 36, SE1/4. <br /> T. 6 S.,R. 89 W., <br /> sec.4, lots 2, 3, and NE1/4 SW1/4. <br /> BLM received your proposal on January 6, 2023.A number of items that BLM specified in our November 9, <br /> 2022 correspondence have been addressed.However, due to the rockslide that occurred on January 18,2023, <br /> conditions have changed and there are additional items that need to be addressed.Accordingly,RMI must <br /> provide the additional information described below within 30 days of receipt of this letter. <br /> Completeness Review: <br /> Consistent with the surface management regulations at 43 CFR§3809.411(a),the BLM has reviewed the <br /> submitted modification to determine if it meets the content requirements at 43 CFR §3809.401(b).Based on <br /> our review,the following additional information is required for the proposed Plan of Operations <br /> Modification to be considered complete: <br /> 1. Pages 4-7 through 4-12.Description of Operations.RMI must adequately update the Description of <br /> Operations Exhibit to include the recent changes of the day-to-day operations and operational procedures, <br /> including the short-and long-term acreage for the operational area as well as an updated project map with <br /> areas of existing and proposed disturbances. This also includes most of the subsections such as the Blasting <br /> INTERIOR REGION 7•UPPER COLORADO BASIN <br /> COLORADO, NEW MEXICO,UTAH.WYOMING <br />
The URL can be used to link to this page
Your browser does not support the video tag.