My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-17_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2023-03-17_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2023 1:53:11 PM
Creation date
3/17/2023 1:48:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
3/17/2023
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company
Inspection Date
3/14/2023
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 15,2023 C-1981-019/Colowyo Coal Mine ZTT <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The only mining activity occurring during the inspection was highwall mining. The highwall miner is currently <br /> operating in the South Taylor Pit. <br /> Backfilling was occurring in the Little Collom Gulch to create a bench for future highwall mining activities. <br /> Backfill was being taken from the previous bench along the eastern side of the gulch and being moved to the west <br /> side. The bench will be used to reach upper coal seams above the current elevation of the gulch. <br /> J <br /> Highwall mining in the South Taylor Pit. Bench development in Little Collom Gulch. <br /> ROADS—Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3),Drainage 4.03.1(4)/4.03.2(4), Surfacing and Maintenance4.03.1(5) and <br /> (6)/4.03.2(5) and(6),Reclamation 4.03.1(7)/4.03.2(7): <br /> Road maintenance and snow removal operations were observed on site. Snow berms and drifts were being cleared <br /> by truck and loader operations. <br /> Maintenance occurred to the outslope of the embankment of the haul road near the Gossard Loadout. Erosion from <br /> runoff through a culvert caused some erosion and maintenance was conducted to fix the erosion. Silt fences were <br /> installed below the maintenance area as best management practice to prevent future erosion until the outslope <br /> stabilizes with vegetation. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.