Laserfiche WebLink
Green needlegrass 1.0 <br /> Total 18.7 <br /> Broadcast seeding, if needed,will be done at double the drill rate. <br /> 6. Post-Reclamation Site Drainage <br /> Final reclamation surfaces will be graded such that onsite drainage waters flow in a similar path <br /> to the original pre-mining path; however,most of the surface water will infiltrate the porous and <br /> dry landscape within 72 hours. <br /> 7. Revegetation Success Criteria <br /> Areas will be deemed adequate when vegetation is established to control erosion and noxious <br /> weeds are not present in any significant amounts and all the conditions of Rule 3.1.10 are met. <br /> 8. Monitoring Reclamation Success <br /> A&S Construction Co. plans to use the local NRCS office to assist in determining the ability of <br /> the reclaimed land to control erosion. If minor changes or modifications are needed to the <br /> seeding and reclamation plan,revision plans will be submitted to the Division, as required. It is <br /> hoped that the Division will aid in evaluating the success of ongoing reclamation processes. All <br /> areas disturbed and reclaimed and any other important items regarding reclamation will be <br /> submitted in the required annual reports to the Division. Throughout the process,weed <br /> mitigation will occur through mechanical removal. If there are issues that arise regarding <br /> noxious weed control, A&S Construction will contact the Kiowa County Noxious Weed <br /> Coordinator for guidance. <br /> 9. Reclamation Bond <br /> The bond for the site will be based upon$2,500 per acre. The site will have 9.9 acres of <br /> disturbance. Since a fraction of an acre is counted a whole acre by the Division,the bond will be <br /> 10.0 acres x $2,500.00 per acre=$25,000.00. <br />