Laserfiche WebLink
Closure Cost Estimate <br /> Fleets(Crews) <br /> Project Name: REX Exploration Montrose County Colorado-Notice or Exploration <br /> Date of Submittal: December 2022 <br /> File Name: REX_NOI_SRCE_Ver_1_4_1_017_NVb.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:20220801_SRCE_Cost_Data_File_1_12_Std_2022.xism <br /> Cost Estimate Type:Surety Cost Basis:N.Nevada Notice Level <br /> EQUIPMENT FLEETS <br /> EQUIPMENT TOTAL LABOR TOTAL <br /> Standard UNIT COST UNIT COST COST <br /> ACTIVITY AND FLEET Crew Size (Hourly) (Hourly) (Hourly) <br /> B-80C-Install Chain Link Fence(Flatbed truck has small crane) <br /> General Laborer 1 1 3 1 $0.00 $150.30 $150.30 <br /> Light Truck-1.5 Ton 1 $47.40 $0.00 $47.40 <br /> Totalsl 1 1 $47.401 $150.301 $197.70 <br /> C-14B-Elevated Concrete Slabs(Reinforced Concrete Shaft Covers) <br /> Foreman 1 $0.00 $93.43 $93.43 <br /> Supervisor's Truck 1 $25.88 $0.00 $25.88 <br /> Carpenter 16 $0.00 $959.20 $959.20 <br /> General Laborer 2 $0.00 $100.20 $100.20 <br /> Rodmen(reinforcing concrete 4 $0.00 $200.40 $200.40 <br /> Cement finisher 2 $0.00 $100.82 $100.82 <br /> Gas Engine Vibrator 1 $6.82 $70.49 $77.31 <br /> Concrete Pump 1 $127.18 $0.00 $127.18 <br /> Totalsl 1 1 $159.881 $1,524.541 $1,684.42 <br /> C-14D-Concrete Walls Formed in Place(Reinforced Concrete Adit Bulkheads) <br /> Foreman 1 $0.00 $93.43 $93.43 <br /> Supervisor's Truck 1 $25.88 $0.00 $25.88 <br /> Carpenter 18 $0.00 $1,079.10 $1,079.10 <br /> General Laborer 2 $0.00 $100.20 $100.20 <br /> Rodmen(reinforcing concrete 2 $0.00 $100.20 $100.20 <br /> Cement finisher 1 $0.00 $50.41 $50.41 <br /> Gas Engine Vibrator 1 $6.82 $70.49 $77.31 <br /> Concrete Pump 1 $127.18 $0.00 $127.18 <br /> Totalsl $159.881 $1,493.83 $1,653.71 <br /> 3/2/2023 <br /> omm o zoo,-> �ac�a 35 of 56 Fleets(Crews) <br /> SRCf Sathue.All <br />