Laserfiche WebLink
Closure Cost Estimate <br /> Expl.Roads&Pads <br /> Project Name: REX Exploration Montrose County Colorado-Notice or Exploration <br /> Date of Submittal: December 2022 <br /> File Name: REX_NOI_SRCE_Ver_1_4_1_017_NVb.xlsm <br /> Model Version:Version 1.4.1 <br /> Cost Data:User Data <br /> Cost Data File:20220801_SRCE_Cost_Dala_File_1_12_Std_2022.xism <br /> Cost Estimate Type:Surety Cost Basis:N.Nevada Notice Level <br /> Exploration Roads&Pads-Cost Summary <br /> Labor I Equipment <br /> Grading Costs $639 $1,350 materials A1$6,",41863493 <br /> Cover Placement Cost $o $0 N/A <br /> Rlppirkg/Scarifying Cost $497 $1,183 N/A <br /> Subtotal Earthworks 1,136 2,533 <br /> Revagelalion Cost $1,225 700 Sb69 <br /> TOTALS $2,361 $3,233 $569 <br /> Exploration Roads&Pads-User Input You must fill in ALL green cells and relevant blue cells in this section for each road <br /> Facility Description Physical(1)-MANDATORY User Overrides Growth Media <br /> Retired. <br /> Underlying Road+ Number Individual Drill Drill slope Volume Disturbed Area Growth Distance to Slope ham <br /> ❑escriptlon Ground Ungraded Cut Drill Pad Road of Drill Sump Pad Pad Replacement (If calculated (If cakulated Media Growth Madle Rued to <br /> (required) ID Code Slope slope Slope Length Width Pad. volume Width Length Percent elsewhere) .1...h...) Thickness Stockpile stockplle <br /> grade H:1V degrees it it cy h ft % cy acres in It %grade <br /> 1 La down Yard S.o 1,3 60.0 too 12.0 1 o 75.0 too t00% <br /> 2 Drill Pads 5A 1.3 60.0 225 12.0 3 12 50.0 75 too <br /> 3 Overland Travel to site N8 15.0 1.3 60.0 110 14.0 0 0 0.0 0 too <br /> 4 Pro osed Roads to Site#11 15.0 1.3 60.0 50 14.0 0 o 0.0 o 100% <br /> 5 Improved Road 15% 15.0 1.31.3 60.0 1,110 12.0 0 o 0.0 0 t00% <br /> 6 Im roved Read 10% 10.0 60.0 110 12.0 0 0 0.0 0 100 <br /> 7 Improved Road 5% 5.0 1.3 60.0 240 12.0 0 0 0.0 0 100 <br /> Notes: <br /> 1.All Physical parameters must be input even if manual overrides for volume or area are used. <br /> 2.Slope replacement refers to the percentage of cut voiumn replaced during regrading. <br /> 3.If Slope from facility to borrow source is>20,downhill travel time may be underestimated due to imitation of uphill travel time curves and downhill speed tables from CAT Handbook(see Productivty Shaet) <br /> 4.Sump volume will be applied to all roads on slopes<20%.On slopes>20%pad width(i.e.cut volume)should be adequate to account for sump volume. <br /> Exploration Roads&Pads-User Input(cont.) You must RII In ALL green cells and relevant blue cells in this section for each road <br /> Grading Growth Media Revegetation <br /> Growm Media <br /> Retired. Additional Placement Additional <br /> Description Materiel Recentouring Hr. Growth Media Equipment Maximum Hrs scadfyingl <br /> I.qulred) Condition Cut Materiel Type Equipment Fleet far Welk-in" Material Type Fleet Fleet Six. for Walk-In"' Seed Mix Mulch Fertilizer Rlpping7 Rlpping Fleet <br /> (salad) (sekcl) (select) (select) (seleq) (us erred.) (sated) (s.l.c1) (select) (select) (select) <br /> 1 La down Yard 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> 2 Drill Pads 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> 3 Overland Travel to Site K8 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> 4 Pro osed Reads to Site N11 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> 5 Im roved Road 15% 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> 6 Im roved Road lo% 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> 7 Improved Road 5% 1 Granite-broken Small Dozer User Mix 1 None None Yes Small Dozer <br /> Notes: <br /> 1.Include one-way hours necessary to walk equipment In from drop-aff paint to work area <br /> 2.Material Types are used for density connection based on material densities in Caterpillar Performance Handbook material density table <br /> 3?72023 <br /> s:a�..:.m..�r ...... Pa e 9 of 56 <br /> - 9 Eapl.!',ad.,X Pads <br />