Laserfiche WebLink
(e) Mining Timetable <br /> As mining is already being conducted under the approved 110c permit, it shall proceed in the same <br /> direction under the 112c permit.The primary location of the approved 110c permit is located at the <br /> northernmost area of the property, encompassing 8.1 acres,while the remaining 1.7 acres under the <br /> permit is located at the southernmost end of the property. Physical mining of the material is proceeding <br /> in a southerly direction. Fine material most in demand, as described in Exhibit D, Subsection D, is in <br /> decline near the northern permit boundary. Coarser material is still prevalent in the area. As fine <br /> material is removed and below grade depth is increased, mining distance from permit boundary is <br /> increased.This enables easier backfill and grading for reclamation purposes. <br /> The following table is an estimation of the amount of acreage increase per year. Points of the table <br /> correspond with maps also included. <br /> Date Acre Point A Point B Point C Point D Point E <br /> Increase <br /> 2023 3.9 12 acres <br /> 2024 4.55 - 16.55 acres <br /> 2025 2.95 - - 19.5 acres <br /> 2026 3.30 - - - 22.8 acres <br /> 2027 4.79 - - - - 27.59 <br /> 43.25 affected acres. Hon-Mineable 14.39 acres <br /> 12 acres-8 1 current y pe•rr tted <br /> 3.9 yet to be mined <br /> state <br /> screening equipment <br /> +cane 1 27 acres <br /> Stockpile areas <br /> a 55 ac-es to be minec <br /> Point C 2 95 acres to be mined <br /> Point D 3 30 acres to be mined <br /> Pont E 4 79 acres to be mined <br />