Laserfiche WebLink
COLORADO <br /> M Division of Water Resources <br /> W Department of Natural Resources <br /> Response to Reclamation Permit Application Consideration <br /> DATE: March 14, 2023 <br /> TO: Clayton C Wein, Environmental Protection Specialist <br /> CC: Division 7 Office; District 78 Water Commissioner <br /> FROM: Kate Fuller, P.E. <br /> RE: Kelly's Pond Project, File No. M-2023-006 <br /> Operator: Crossfire Aggregate Services LLC <br /> Contact: Nathan A Barton, (970) 564-1380 <br /> SW '/a NE'/a Sec. 21, Twp. 33N, Rng. 5W, N.M. P.M., Archuleta County <br /> CONDITIONS FOR APPROVAL <br /> ® The application materials indicate that a storm water detention structure may be <br /> constructed as a part of this project. The applicant should be aware that, unless the <br /> structure can meet the requirements of a "storm water detention and infiltration facility" <br /> as defined in section 37-92-602(8), Colorado Revised Statutes, the structure may be subject <br /> to administration by this office. The applicant should review DWR's Administrative <br /> Statement Regarding the Management of Storm Water Detention Facilities and Post- <br /> Wildland Fire Facilities in Colorado, attached, to ensure that the notification, construction <br /> and operation of the proposed structure meets statutory and administrative <br /> requirements. The applicant is encouraged to use Colorado Stormwater Detention and <br /> Infiltration Facility Notification Portal, located at <br /> https://maperture.digitaldataservices.com/qvh/?viewer=cswdif, to meet the notification <br /> requirements. <br /> ® The proposed operation will consume ground water by: ® evaporation, ❑ dust control, ❑ <br /> reclamation, ❑ water removed in the mined product, ❑ processing, ❑ other:. <br /> Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br /> gravel pit or other type of well permit, as applicable. <br /> ® Prior to approving a well permit, the applicant must conduct a field inspection of the site <br /> and document the locations of all wells within 600 feet of the permit area. The applicant <br /> must then obtain a waiver of objection from all well owners with wells within 600 feet of <br /> the permit area or request a hearing before the State Engineer. <br /> ® Other: All water used on-site shall be a legal supply of water provided by an appropriate <br /> supplier. The applicant shall confirm the legality of any proposed source of water supply <br /> with the Division of Water Resources prior to use in the operation. <br /> COMMENTS: The local Water Commissioner, Becky Guilliams, may be contacted at (970) 946-9943 or <br /> Rebecca.Guilliams@state.co.us regarding legal water supplies in the area. <br /> ��OF cOl0 <br /> 1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 www.colorado.gov/water <br /> Jared S. Polis, Governor I Dan Gibbs, Executive Director I Kevin G. Rein, State Engineer/Director I * * <br /> *1876 <br />