Laserfiche WebLink
Reveg Worksheet Cont'd Task#001 Page 5 of 5 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: PUEBLO <br /> Total one-way travel distance: 13.00 miles <br /> Average Travel Speed: 50.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,098.16 <br /> two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** $45.26 <br /> **one round trip,no haul rig: <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> E ui ment Equipment <br /> Haul Time(Hours): 0.26 0.26 <br /> Return Time(Hours): 0.26 0.26 <br /> Loading Time(Hours): 0.40 NA <br /> Unloading Time(Hours): 0.40 NA <br /> Subtotals: 1.32 0.52 <br /> JOB TIME AND COST <br /> Total job time: 2.64 Hours <br /> Total job cost: $2,143 <br />