Laserfiche WebLink
Page 19 <br /> 6.4.12 EXHIBIT L - Reclamation Costs <br /> Typical Liner and Regrade for Extraction Limit Wall — Final Reclamation <br /> _ _ _ _ _ _ _______________- Original ground surface Sequence <br /> Topsoil 1. In cycles <br /> • Install liner in 6"lifts <br /> Static Water Level Backfill to 3H•1V <br /> Liner 2. Replacetopsoil <br /> Regraded slope at 3H:1V <br /> g p <br /> Backfill material <br /> Unexcavated Perimeter Wall <br /> (slope 1.25H:1V <br /> ) <br /> Keyway Bedrock <br /> Typical Liner and Regrade for Extraction Limit Wall <br /> Raptor conservatively estimates for Financial Warranty purposes an approximately 4,020- <br /> foot wall excavated at 21-1:1V, a 2,180-foot wall at 1.25:1V slopes, and a 4,610-foot wall <br /> at 3H:1V. <br /> Perimeter liner at 21-1:IV, 4,020 lin.ft. x 78 sq.ft./ft x 4 ft. / 27 = 46,610 CY of liner placed <br /> at an estimated cost of $2.20/CY = $ 102,541.11. <br /> Perimeter liner at 1.251-1:1V, 2,180 lin.ft. x 56 sq.ft./ft x 4 ft. / 27 = 18,095 CY of liner <br /> placed at an estimated cost of $2.20/CY = $ 39,808.46. <br /> Perimeter liner at 3H:1V, 4,610 lin.ft. x 111 sq.ft./ft x 4 ft. / 27 = 75,590 CY of liner <br /> placed at an estimated cost of $2.20/CY = $ 166,298.33. <br /> Keyway at the base of the 3:1 slope is estimated at 9,500 lin.ft. x 16 sq.ft. / 27 = 5,630 <br /> CY of liner placed an estimated cost of $2.20/CY = $12,385.19. <br /> $ 321,033.08 Total Liner Installation Cost <br /> NOTE: This is a conservative approach to the estimation of reclamation cost for financial <br /> warrant at the projected 5-year disturbance. The distance of 2H:1V wall is maximized <br /> which has a higher lining cost than wall at 1.25H:1 V. Also, if sufficient backfill material <br /> were available or accessible on site from either topsoil or overburden material in <br /> temporary stockpiles, or readily accessible from bedrock exposed, backfilling all the <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[112]CONSTRUCTION PE RMIT APPLICATION—COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />