Laserfiche WebLink
Page 114 <br /> 6.4.12 EXHIBIT L - Reclamation Costs <br /> OTHER MISCELLANEOUS COSTS: <br /> Mobilization and demobilization costs are based upon the Division's estimates, which are <br /> pending — but estimated in the summary at the beginning of this Exhibit L at $10,000. <br /> Demolition of Structures: <br /> None. Building Permits for structures will be obtain where required from the Weld <br /> County Building Department. <br /> Please Note: Since there is no possibility of the applicant in fully reproducing <br /> the Division's methods, utilizing similarities from past OMLR calculations is the <br /> most viable and accurate means available for the applicant to derive <br /> reasonable estimates of per unit costs and should result in estimates very <br /> reliable with that of the Division. <br /> - <br /> .wers+a <br /> Extraction of the Core following completion of the Perimeter Extraction Keyway <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />