Laserfiche WebLink
Page 112 <br /> 6.4.12 EXHIBIT L - Reclamation Costs <br /> $ 58.72± Preferred Seed Mix <br /> x 8.5± acres <br /> $ 499.12± Sub-Total Seed <br /> The cost for applying seed is based upon information derived in proximity to the Northern <br /> Colorado economy. Costs for tilling, fertilizing and seeding are based upon estimates <br /> from Longs Peak Equipment Co. These costs, including labor, are reflected as follows: <br /> $ 25.00± per acre Tilling <br /> $ 20.00± per acre Fertilizing <br /> $ 20.00± per acre Seeding <br /> $ 65.00± per acre Total Application Cost per Acre. <br /> x 8.5± acres <br /> $ 552.5± Sub-Total —Application Costs <br /> $ 1,051.62± Sub-Total Re-vegetation (seed + application) Costs. <br /> Assume a 50± percent failure and add half the expense back into the total for reseeding, <br /> or: <br /> $ 525.81± Sub-Total Re-seeding costs <br /> $ 1,577.43± Excavation Area Re-vegetation Expense <br /> Re-vegetation of the 21.35 acre processing area is also estimated. <br /> $ 58.72± Preferred Seed Mix <br /> x 21.35± acres <br /> $ 1,253.67± Sub-Total Seed <br /> $ 65.00± per acre Total Application Cost per Acre. <br /> x 21.35± acres <br /> $ 1,387.75± Sub-Total —Application Costs <br /> $ 2,641.42± Sub-Total Re-vegetation (seed + application) Costs. <br /> Assume a 50± percent failure and add half the expense back into the total for reseeding, <br /> or: <br /> $ 1,320.71± Sub-Total Re-seeding costs <br /> $ 3,962.13± Processing Area Re-vegetation Expense <br /> $ 5,449.27 Total Re-vegetation Cost <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />