My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-08_REVISION - M1973021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2023-03-08_REVISION - M1973021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 7:50:01 AM
Creation date
3/9/2023 7:32:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
3/8/2023
Doc Name
Issuance Documents
From
DRMS
To
Holcim - WCR, Inc.
Type & Sequence
SO3
Email Name
ECS
MAC
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> M2001016,M2016054,M1977141,M1992069,M2020058,M1999098,M1989029,M1994027,M2000087,M2004051,M1989120 <br /> M1992069,M2020058,M1999098,M1989029,M1994027,M2000087,M2004051,M1989120,M1977436,M1999034,M1994093 <br /> M2004031,M2994044 <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above,the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Success not a ee, the Division will render its decision within 30 days. <br /> I have reviewed the information provided in this Application <br /> r <br /> Packet,as well as the applicable Act and Rules. Having been fully <br /> zp�z��z informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> prospectiv-e-StiFc-&or MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms(available online at <br /> ht!p:i/mining.state.co.us/Mineral%20Forms.htm). <br /> - 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.