My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-03_REVISION - M2003016
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003016
>
2023-03-03_REVISION - M2003016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2023 8:37:28 PM
Creation date
3/6/2023 7:48:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003016
IBM Index Class Name
Revision
Doc Date
3/3/2023
Doc Name
Request for Technical Revision
From
City and County of Broomfield
To
DRMS
Type & Sequence
TR6
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Of co o <br /> " COLORADO DIVISION OF RECLAMATION <br /> , MINING AND SAFETY <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> 1876 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET TR-6 C <br /> File No.: M- 2003016 site Name: Heit Campus Infrastructure <br /> county Weld County TR# (DRMS Use only) <br /> Permittee: City and County of Broomfield <br /> Operator(If Other than Permittee): FD <br /> Permittee Representative: Brennan Middleton p� 3 2023 <br /> M11y�N�,q�p SAPS�lpN <br /> Please provide a brief description of the proposed revision: <br /> Proposed revision includes the construction of a deep wet well containing two (2) submersible <br /> PUMPS to ret,irn uwater to the Soi 11h Platte Rover!hrol igh a network ol pipes from the Heit Pot and <br /> a rundown for water diverted from the Meadow Island #1 ditch. <br /> As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered "filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted(mark only one) <br /> 1 IOc, 111, 112 construction ❑ <br /> materials, and 1 l2 quarries $216 <br /> 112 hard rock(not DMO) $175 ❑ <br /> 1 IOd, 112d(l, 2 or 3) $1006 ❑ <br />
The URL can be used to link to this page
Your browser does not support the video tag.