My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-02_REVISION - M2006013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006013
>
2023-03-02_REVISION - M2006013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2023 7:37:25 AM
Creation date
3/2/2023 10:11:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006013
IBM Index Class Name
Revision
Doc Date
3/2/2023
Doc Name Note
Financial Warranty Cost Estimate Enclosed
Doc Name
Notice of Surety Increase
From
DRMS
To
Ronda Neumeister
Type & Sequence
SI2
Email Name
ANM
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCRAPER TEAM WORK <br /> Task description: Spread Topsoil over 18.5 acres <br /> Site: Potts Pit#2 Permit Action: 2023 Inspection ANM Permit/Job#: M2006013 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 2/7/2023 County: Huerfano Filename: M013-002 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 627G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA NA NA 25 25 <br /> Ownership cost/hour: $227.06 NA NA NA $57.51 $37.19 <br /> Operating cost/hour: $252.32 NA NA NA $11.81 $12.83 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA NA NA $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA NA NA $28.56 $0.00 <br /> Unit Subtotals: $510.28 NA NA NA $97.88 $50.02 <br /> Number of Units: 2 0 0 0 1 1 <br /> Group Subtotals: Work: $1,020.56 Support: $0.00 Maine $147.90 <br /> Total work team cost/hour: $1,168.46 <br /> MATERIAL QUANTITIES <br /> Initial volume: 8,849 CCY Swell factor: 1.000 <br /> Loose volume: 8,849 LCY <br /> Source of estimated volume: Exhibit L,M-2006-013 Amendment <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 1,600 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Top Soil Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 33.00 LCY Adjusted Capacity: 18.85 LCY <br />
The URL can be used to link to this page
Your browser does not support the video tag.