Laserfiche WebLink
SCRAPER TEAM WORK <br /> Task description: Spread overburden/waste <br /> Site: Potts Pit#2 Permit Action: 2023 Inspection ANM Permit/Job#: M2006013 <br /> PROJECT IDENTIFICATION <br /> Task#: 001 State: Colorado Abbreviation: None <br /> Date: 2/7/2023 County: Huerfano Filename: MO13-001 <br /> User: ANM <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShiftbasis: I per day <br /> Equipment Description <br /> -Scraper: Cat 627G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance-Motor Grader: CAT 12M <br /> -Water Truck: Water Tanker, 5,000 Gal. <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 25 25 25 25 <br /> Ownership cost/hour: $227.06 NA $124.85 $124.85 $57.51 $37.19 <br /> Operating cost/hour: $252.32 NA $24.41 $24.41 $11.81 $12.83 <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Ripper op. cost/hour: NA NA $0.00 $0.00 $0.00 $0.00 <br /> Operator cost/hour: $30.90 NA $41.30 $41.30 $28.56 $0.00 <br /> Unit Subtotals: $510.28 NA $190.56 $190.56 $97.88 $50.02 <br /> Number of Units: 2 0 1 1 1 1 <br /> Group Subtotals: Work: $1,020.56 Support: $381.12 Maine $147.90 <br /> Total work team cost/hour: $1,549.58 <br /> MATERIAL QUANTITIES <br /> Initial volume: 16,703 CCY Swell factor: 1.000 <br /> Loose volume: 16,703 LCY <br /> Source of estimated volume: Exhibit L,M-2006-013 Amendment <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,900 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Sand and gravel-Dry Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 18.21 LCY Adjusted Capacity: 18.21 LCY <br />