Laserfiche WebLink
DocuSign Envelope ID:64D10302-5C5E-4249-AA1 E-97AME2FM7 <br /> PO#:461001563 <br /> Routing#:21-HA3-ZG-00063 <br /> STATE OF COLORADO CONTRACT <br /> COVER PAGE <br /> State Agency Agreement Number <br /> Colorado Department of Transportation 21-HA3-ZG-00063 <br /> Contractor Contract Performance Beginning Date <br /> IHC SCOTT INC Shall be the Effective Date of the approval of the <br /> State Controller or designee. <br /> Contract Maximum Amount Initial Contract Expiration Date <br /> $20,465,000.02 Shall be five years from the Effective Date or the <br /> Contract Encumbrance Amount date of final acceptance of the project whichever <br /> $6,913,351.01 State Fiscal Year 2021 occurs first. <br /> Contract Purpose <br /> Furnish all Materials and perform all services not specifically excepted in this Contract that are necessary or <br /> incidental to the complete construction of Colorado Project No.NHPP 0132-022 consisting of highway and <br /> bridge construction or maintenance consisting of clearing and grubbing, earthwork, excavation, a wildlife <br /> underpass structure,retaining walls,culvert removal and replacement,culvert lining,concrete work,paving, <br /> shouldering,fencing,striping,signage,wildlife detection system,traffic control,erosion control,and seeding, <br /> located on on SH 13 NORTH OF CRAIG MP 110-91 and MP 116.09 in Moffat County in the State of <br /> Colorado as described in the Plans and Specifications for the project incorporated herein by reference. <br /> Exhibits and Order of Precedence <br /> The following Exhibits and attachments are included with this Contract: <br /> 1. Exhibit A—Contractor Bid Proposal <br /> 2. Exhibit B—Performance Bond <br /> 3. Exhibit C—Payment Bond <br /> 4. Exhibit D—Federal Requirements <br /> 5. Exhibit E—Contract Modification Order <br /> 6. Exhibit F—Payment Schedule <br /> 7. Exhibit G—Sample Option Letter <br /> 8. Exhibit H—Contractor's Authorized Agents <br /> 9. Exhibit I—Required Contract Provisions Federal-Aid Construction Contracts <br /> In the event of a conflict or inconsistency between this Contract and any Exhibit or attachment,such conflict <br /> or inconsistency shall be resolved by reference to the documents in the following order of priority: <br /> 1. Exhibit I—Federal Requirements <br /> 2. Colorado Special Provisions in§20 of the main body of this Contract <br /> 3. Special Provisions for the Project <br /> a. Project Special Provisions <br /> b. Standard Special Provisions <br /> 4. Project Plans <br /> 5. Project Specifications <br /> 6. The provisions of the other sections of the main body of this Contract <br /> 7. Exhibit A—Contractor's Bid Proposal <br /> 8. Exhibits B through I in descending order <br /> Principal Representatives <br /> For the State: For Contractor: <br /> Justin Kuhn Tony Roberts <br /> Colorado Department of Transportation(R3) IHC SCOTT INC <br /> 270 Ranney Street 7135 S TUSCON WAY <br /> Craig,CO 81625 CENTENNIAL,CO 80112 <br /> 970-826-5189 303-790-9100 <br /> Justin.Kuhn@state.co.us estimating@scottcontracting.com <br /> Document Builder Generated Page 1 of 59 Version 0819 <br />