My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-01_PERMIT FILE - M2022051
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2022051
>
2023-03-01_PERMIT FILE - M2022051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2023 8:36:25 PM
Creation date
3/2/2023 9:25:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2022051
IBM Index Class Name
Permit File
Doc Date
3/1/2023
Doc Name
Application
From
IHC Scott, Inc.
To
DRMS
Email Name
ACY
THM
SMS
AWA
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E -Maps <br /> Rule 6.3.5 <br /> The Operator/Applicant must provide at least two maps which clearly describes the features associated <br /> with the Mining Plan and the components of the Reclamation Plan. The Mining Plan Map and the <br /> Reclamation Plan Map must satisfy the general map requirements of Rule 6.2.1(2), and illustrate the <br /> information specified under Rules 6.3.2(b), 6.3.3, 6.3.4, and 6.3.5. The maps must show the name of the <br /> Applicant, signed and dated, an appropriate scale not larger than 1 inch= 50 feet nor smaller than 1 inch <br /> =660 feet, legend,title,and a north arrow.Multiple maps may be used to depict the required information <br /> below. It may be helpful to include an aerial photo and label the required information on the aerial photo. <br /> The Applicant may choose to use the following two optional templates for the Mining Plan Map and <br /> Reclamation Plan Map or attach separate maps. <br /> 1) Mining Plan Map Checklist: <br /> a. J r L Outline and label the permit boundaries; <br /> b. Label the surface and subsurface owner(s)of the permit area; <br /> c. J r L Label all surface owners within 200 feet of the permit boundary; <br /> d. J r L Show all permanent man-made structures within the permit boundary and within <br /> two hundred(200) feet of the permit boundary and label the owners of the structures; <br /> e. �• ] Outline and label all major surface features to be used in the project(existing and <br /> proposed roads,pit boundary, and topsoil, overburden, and product stockpiles); <br /> f. I y l Indicate the direction that the construction material extraction will proceed; and <br /> g. II Show the existing topography(contour lines of sufficient detail are required to <br /> portray the direction and rate of slope of the affected land). <br /> 2) Reclamation Plan Map Checklist: <br /> a. Il Show the proposed gradient of all reclaimed slopes (horizontal:vertical) sufficient <br /> to describe the post mine topography; <br /> b. ly l If ponds are a part of the Reclamation Plan, outline the final shore configuration of <br /> the ponds and shallow areas if the future land use is for wildlife; <br /> c. 7 State the average thickness of replaced overburden; <br /> d. II State the average thickness of replaced topsoil; <br /> e. I y l Depict any features which will remain after mining is completed, if applicable; and <br /> f. J r L Outline areas where seeding will occur or different seed mixtures will be used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.