Laserfiche WebLink
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing,procedures, criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E -Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> F Cropland(CR) Pastureland(PL) General Agriculture (GA) <br /> F Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) ** <br /> n Residential (RS) Recreation(RC) Industrial/Commercial (IC) <br /> n Developed Water Resource (WR) <br /> **Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> The mined area will be graded to a 3.2:1 slope and then topsoil will be placed and roughened <br /> to prevent erosion. The area will then be seeded and mulched. <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E-Map: <br /> The existing access road and new access road will be left in place. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 311:1 V; remaining <br /> slope lengths may not be steeper than 2H:1V(see example sketch below). <br /> ................................._......................._..... <br /> 5' <br /> ......_ ........................................................ <br /> 10, 1 <br /> 1 <br />