My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-03-01_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2023-03-01_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2023 1:28:12 PM
Creation date
3/1/2023 1:17:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
3/1/2023
Doc Name
Adequacy Review #2
From
DRMS
To
Trapper Mining, Inc.
Type & Sequence
PR11
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Affected acreage is not carried or calculated on the ARR form and is only relevant to the DRMS permitting system. <br /> The number will be updated as applicable in the future with permit revision actions during the submittal process. <br /> Trappers' response adequately addresses the above cited rule. <br /> Rule: 2.05.3(3) Mine Facilities <br /> DRMS 28 February 2023 <br /> DRMS understands that proposed haulroads will be built in 2023, 2024 and 2025. The new <br /> roads will require an engineer's certification once built. The above rule is adequately addressed <br /> in permit sections 3.7.2 and 1.4 and with maps M13A, M13B, M13C, M9 and Appendix S with <br /> the exception of: <br /> 19. Please assure that DRMS receives the Engineers Certification in a timely manner. <br /> Trapper Response to Comment 19: It is on Trapper's Colorado Professional Licensed Engineer's <br /> tickler file to certify new haulroads as they are constructed. <br /> Trappers' response adequately addresses the above cited rule. <br /> Rule: 2.05.3(6) Overburden and Blasting Plan <br /> DRMS 28 February 2023 <br /> Public notice of blasting was submitted with PR11. DRMS notes that pre blast survey <br /> notifications have not been sent to owners near the proposed expansion area science 2003, with <br /> the most recent surveys conducted in 1987. With the opening of C Pit and I Pit West a preblast <br /> survey notification as per Rule 4.08.2 appears required. <br /> Sage Creek holdings is not on the pre blast survey information (Table 3.4-1, page 3-28a). <br /> Blasting could impact the two groundwater monitoring wells utilized for the Williams Fork <br /> Permit. These wells are not listed on the Structures List; Table 3.4-2 page 3-28b. No blasting <br /> plan for the expansion area was proposed with the PR11 submission. <br /> 20. Please provide a blasting plan for the expansion area. <br /> Trapper Response to Comment 20: Trapper's blasting plan,as outlined in permit Section 3.4,covers <br /> the entire mine. There is no need to make a specific blasting plan for the expansion area. <br /> Trappers' response adequately addresses the above cited rule. <br /> 21. Please update the above referenced tables with the additional owners and structures as <br /> referenced above. <br /> Trapper Response to Comment 21: As required by the Division,a blasting schedule public notice will be <br /> sent to all owners of dwellings and structures inside and within one-half mile of Trapper's permit boundary in <br /> February 2023. As part of that public notice submittal,dwelling and structure owners relatively near the <br /> proposed C and I Pits will receive an invitation to request a pre-blast survey--including Francis&Louise Lux, <br /> John Hogue,Jacob Timmer and Sage Creek Holdings. Enclosed Table 3.4-1 and has been updated to reflect <br /> this information. Enclosed Table 3.4-2 is updated to add the Sage Creek Holdings monitor wells. In addition, <br /> Map M13A(sheet 1)has been updated to show the Sage Creek Holdings monitor wells. <br /> Trappers' response adequately addresses the above cited rule. <br /> DRMS understands that C Pit has been previously mined. DRMS also understands that a <br /> 4,500,000 LCY overburden stockpile (pages 3-15b and 3-15c) near C pit will be utilized for <br /> overburden storage and a temporary spoil pile of 600,000 LCY will be located east of No <br /> Name Pond #2 south of the BC haul road. <br /> 9 <br /> Trapper Mine PR I ADQ No 2 <br /> 2023 February <br />
The URL can be used to link to this page
Your browser does not support the video tag.