Laserfiche WebLink
-2- <br /> 9. Primary Mine Entrance Location(report in either Latitude/Longitude OR UTM): <br /> Lea#ta on itude: <br /> Example: (N) 44' 12.98" <br /> (W) 104° .87" <br /> Latitude(N): deg min (2 decimal places) <br /> Longitude(W): deg min sec (2 decimal places) <br /> OR <br /> le: (N) 39.73691° <br /> -104.984490 <br /> Latitude(N) (5 decimal places) <br /> Longitude(W) ( laces) <br /> OR <br /> Universal Transverse Mercator(UTM) <br /> Example: 201336.3 E NAD27 Zone 13 <br /> 4398351.2 N <br /> UTM Datum(specify NAD27,NAD83 or WGS 84) WGS 84 Zone 13S <br /> Easting 287180 <br /> N 13SBB8718007865 <br /> Northing 4107865 <br /> 11. Primag Present Land Use check only one): <br /> Cropland(CR) ✓ Pastureland(PL) ❑General Agriculture(GA) <br /> Rangeland(RL) ❑Forestry(FR) F]Wildlife Habitat(WL) <br /> Residential(RS) nRecreation(RC) ❑Industrial/Commercial QC) <br /> Developed Water Resources(WR) <br /> 10. Primary Future(Post-mining)Land Use(check only one): <br /> RCropland(CR) R Pastureland(PL) II General Agriculture(GA) <br /> R Rangeland(RL) II Forestry(FR) F]Wildlife Habitat(WL) <br /> RResidential(RS) D Recreation(RC) R Industrial/Commercial(IC) <br /> �✓ Developed Water Resources(WR) With continued pastureland use around pond <br /> 12. Duration of Project: <br /> 12.1 Estimated beginning date of excavation: 15 July 2022 <br /> 12.2 Estimated completion date of excavation: 14 July 2023 <br />