My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-27_PERMIT FILE - M2023006
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2023006
>
2023-02-27_PERMIT FILE - M2023006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 8:42:58 PM
Creation date
2/28/2023 9:04:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2023006
IBM Index Class Name
Permit File
Doc Date
2/27/2023
Doc Name
Application
From
Crossfire Aggregate Services LLC
To
DRMS
Email Name
CCW
THM
SMS
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D-Reclamation Plan <br /> Rule 6.3.4 <br /> The purpose of the Reclamation Plan is to describe the timing,procedures,criteria and materials that will <br /> be used to reclaim the affected land to the proposed future land use. This plan must be correlated to <br /> Exhibit E-Map. <br /> 1) Primary future(Post-mining) land use(check one): <br /> Cropland (CR) _a Pastureland (PL) General Agriculture (GA) <br /> Rangeland (RL) Forestry(FR) n Wildlife Habitat(WL) ** <br /> F Residential (RS) Recreation(RC) Industrial/Commercial (IC) <br /> _a Developed Water Resource (WR) <br /> **Note: The Colorado Parks & Wildlife (CPW) must be consulted where wildlife use is the <br /> proposed future land use. <br /> 2) Please provide a general description of how the mined area will be reclaimed: <br /> Reclaim the area as a pond (hydraulically connected to the Piedra River through the alluvium <br /> under SH-151 and Lob Lolly industrial area) of approximately 2.0 to 2.5 acres with slopes as <br /> required for ponds. Some boulders may be used for landscaping. Plant area surrounding the <br /> pond above ordinary highwater mar in grasses and leave the access for in use pos <br /> 3) Specify which ponds, streams, roads and buildings, if any, will remain after reclamation. <br /> These features must be shown on the Exhibit E-Map: <br /> The pond (assumed to be a single pond but potentially with two lobes), and the access road will <br /> remain. No buildings to be installed/built or removed. Some boulders may be used for <br /> landscaping and in the pond. <br /> Note: if ponds are a part of the Reclamation Plan, slopes from 5 vertical feet above to 10 <br /> vertical feet below the expected average water level cannot be steeper than 311:1V; remaining <br /> slope lengths may not be steeper than 211:1V(see example sketch below). <br /> See Exhibits C and D for topography before/after mining <br /> including pond slopes AT LEAST five feet above and ten below <br /> OHWM. <br /> 5' <br /> ....._ ......................_._..........._............. . <br /> 10, 1 , <br /> ......................... ............................................................ ..............._................................................ .................... . <br />
The URL can be used to link to this page
Your browser does not support the video tag.