My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-12-04_GENERAL DOCUMENTS - C1981017
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
2000-12-04_GENERAL DOCUMENTS - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 9:28:13 AM
Creation date
2/27/2023 9:23:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
General Documents
Doc Date
12/4/2000
Doc Name Note
Coal Basin/Sutey Ditch 8 Reconstruction Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Coal Basin/Sutey Ditch 8 Reconstruction Project <br /> PKA-0-459 <br /> I. PROJECT OVERVIEW <br /> The purpose of this Project was to reconstruct the 008 drainage ditch on the south facing portion of the <br /> Sutey Refuse Disposal area, as the existing ditch was prone to extensive erosion. <br /> II. LANDOWNER CONSENT <br /> Coal Revocation site, no consent needed <br /> III CONSTRUCTION <br /> PICA-0-459, Coal Basin/Sutey Ditch 8 Reconstruction_Project <br /> Contract Number: C188260 <br /> Advertisement for Bid Dates: April 28 &25, 2000 <br /> Pre-Bid Meeting Date May 2, 2000: <br /> Bid Opening Date: May 18, 2000 <br /> Low Bid Amount: $19,588.00 <br /> Number of Bids: 4 <br /> Notice of Award Date: May 19, 2000 <br /> Notice to Proceed Date: July 7, 2000 <br /> Construction Start Date: July 7, 2000 <br /> Construction Completion Date: July 26, 2000 <br /> Final Settlement Advertisement Dates: August 14 &21, 2000 <br /> Final Settlement Date: September 1, 2000 <br /> Contractor RM Cat Environmental Services <br /> Address: 1040—A Elkton Drive, Colorado Springs, CO 80907 <br /> Phone: 719-598- 1222 <br /> Subcontractor <br /> Final Cost $23,363.50 <br /> Change Order(s) 1) $7,867.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.