Laserfiche WebLink
IV. CONSTRUCTION SUMMARY <br /> Due to less than average snowfall, and subsequent lower than normal spring runoff, there was no need to <br /> perform any site maintenance. Therefore,the Contractor was never called to the site, and no monies were <br /> expended. <br /> V. FUTURE MAINTENANCE <br /> No maintenance associated with this Project is needed. <br /> VI. SUMMARY <br /> This Project was intended to provide the Division with a means of addressing any emergency situation <br /> which may develop at Coal Basin as a result of Spring runoff. No need developed during the Spring/early <br /> summer of 2000. <br /> This Bid may be re-issued as needed in the future. <br /> Project Manager Steve Renner <br /> Date 12-05-00 <br /> M:\imp\closeout\coalb00spgmnt.doc <br />