Laserfiche WebLink
PROJECT NAME Sunlight Coal Mine Revocation Maintenance <br /> Funding Source—FMS Severance Tax <br /> GENERAL PROJECT INFORMATION: <br /> The Coal Regulatory Section requested that the exposed adit closure(concrete block wall)be <br /> backfilled, and that a subsidence feature be stabilized. <br /> Purchase Order or Contract Number N/A—Direct Bill <br /> Advertisement for Bid Dates: N/A—Direct Bill <br /> Pre-bid Meeting Date N/A—Direct Bill <br /> Bid Opening Date: N/A—Direct Bill _ <br /> Successful Bid Amount: $4,700.00 _ <br /> Number of Bids 1 <br /> Notice of Award Date N/A—Direct Bill <br /> Notice to Proceed Date September 9,2013 <br /> Construction Start Date; Se I tember 9,2013 <br /> Construction Completion Date September 10,2013 <br /> Final Settlement Advertisement Date N/A - Direct Bill <br /> Final TOTAL PROJECT Cost $4,700.00 <br /> IV. Construction Summary and Narrative <br /> Work at the adit closure consisted of excavating a berm located southerly of the former <br /> mine entry, and backfilling against the block wall so that the wall is covered, and so that <br /> the backfill blends with adjacent topography. <br /> Work at the subsidence feature consisted of excavating the subsidence feature to expose <br /> the underlying mine entry for a distance of approximately twenty five feet inby the adit <br /> block wall closure. Once exposed, the open entry was backfilled until no void was left. <br /> The excavated overburden was replaced and the entire area graded to blend with adjacent <br /> topography. <br /> Both the adit and subsidence area were roughened to prevent surface runoff. The area <br /> will be seeded in the fall of 2013. <br /> 1) 3) <br /> Project anager Senior Project Manager <br /> Date Date <br /> 2) 4) _ _ _ <br /> Grants Officer a)AMLIS(Deb)/b)BrassCap(Yvonne,then to Kristin for <br /> filing) <br /> Date Date <br />