Laserfiche WebLink
• <br /> 4/02/90 <br /> The CONTRACTOR shall provide such temporary barricades, fences, or warning <br /> signs as may be necessary to make temporary or permanent roads safe by night <br /> as well as by day. He shall at all times have a sufficient number of <br /> watchmen, flagmen, and warning lights to protect traffic where it is <br /> interfered with by his operations, where his trucks enter or leave public <br /> roads, or where work is being done adjacent to such roads. <br /> 19. PERMITS, LICENSES AND REGULATIONS <br /> Permits and licenses required for prosecution of the work shall be procured <br /> and paid for by the CONTRACTOR. <br /> 20. ESTIMATED QUANTITIES <br /> The CONTRACTOR shall understand that the quantities and measurements set forth <br /> in the Special Conditions are in no case exact and in some instances the exact <br /> quantities and measurements are impossible to determine until after conditions <br /> have become known during construction; that the quantities shown in the <br /> Special Conditions are for use as a basis for comparing bids only. The OWNER <br /> does not expressly, or by implication, agree that the actual amount of work <br /> performed or material furnished or installed will correspond therewith and <br /> further, that during the progress of the work the OWNER may find it advisable <br /> and shall have the right to make changes in locations of portions of the work, <br /> to omit portions of the work and to increase or decrease the quantities , as <br /> may be deemed necessary or desirable. Under no circumstances or conditions <br /> will the CONTRACTOR be paid anything on account of anticipated profits upon <br /> the work or any portion thereof covered by the Contract which is not actually <br /> performed; nor will the CONTRACTOR be paid more than the unit price bid for <br /> any item of the Bid because the actual quantity is greater or less than the <br /> quantity shown in the Invitation and Bid Sheet. <br /> Measurements of any openings have been made in sufficient detail to establish <br /> general shapes and dimensions. The locations and dimensions of vertical and <br /> horizontal openings and depths of materials shown on the documents as waste <br /> material , soil and unconsolidated material and rock material are approximate <br /> measurements only and shall be verified by excavation. <br /> The OWNER, without invalidating the purchase order contract, may order extra <br /> work, or make any other reasonably related changes by altering adding to or <br /> deducting from the work; the contract price and time for completion of the <br /> work being adjusted accordingly by mutual agreement. C.R.S. 24-105-301 <br /> through 24-106-101 , as amended are incorporated and made a part herein by <br /> reference as if fully set forth herein. <br /> If the OWNER deems inexpedient the correction of damaged work or of work not <br /> performed in accordance with the contract, equitable reduction of contract <br /> price shall be made therefore. <br /> 21 . ACCIDENT PREVENTION AND SAFETY MEASURES <br /> The CONTRACTOR shall comply with applicable provisions of OSHA Part 1926, <br /> Construction Standards and Interpretations, in effect on the date of issuance <br /> of the Invitation for Bids. The CONTRACTOR shall continuously maintain, at <br /> this expense, adequate protection of the work and the OWNER'S property, and <br /> shall take all practicable precautions in the interest of safety. <br /> MLRD-9 <br />