Laserfiche WebLink
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> PERMIT INFORMATION <br /> Permit Number Operator Name Mine Name <br /> P-1996-041 Phil Hannum Gold Hill Mining District <br /> Type of Mine: Notice of Intent to Conduct Prospecting Commodity- Mineral Prospecting <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Gold Hill Mining District Notice of Intent (NOI) is located east of Gold Hill in Boulder County. Prospecting <br /> occurred in mining claims located in Section 7, Township 1 N, Range 71 West in the 6rh Prime Meridian. The <br /> NOI was issued to Phil Hannum in 1996. The NOI noted several claims to be prospected under the NOI; <br /> Snowbound, Wild Tiger, Clara, Frank, Madge, Maud, Blancha, Henry, Thanksgiving and Little Ginny veins. <br /> In 2011, the NOI was revoked and the bond money in the amount of$2,000.00 was forfeited for failure to pay <br /> annual fees. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Pe-. - -• Ct.! - Purchase Order <br /> (circle one) Invitation for Bid <br /> PO Number: Contractor Name & Address: Construction Bond Amount (after 5% <br /> PKA-15-742 Dates: administrative fee removed): <br /> (Included in the Gold Berry Trucking and $1,900.00 <br /> Run Mine Closure Excavating, Inc. Start: 8/27/2015 <br /> Project) 5681 So. Ammons St. Severance Tax: $ 150.00 <br /> Littleton, CO 80128 <br /> End: 8/27/2015 Project Cost: $2,050.00 <br /> Construction Work Description <br /> The Phil Hannum NOI reclamation work was included in the Gold Run Mine Closure Project due to its proximity to <br /> other mine closures in the area (PO Number PKA-15-752). The NOI application submitted by Phil Hannum was <br /> vague on the location of the prospecting activity. DRMS inspection reports and claim maps were used to determine <br /> the likely NOI disturbance. The Snowbound mining claim contained a shaft approximately 10-ft wide, 12-ft long <br /> and 20-ft deep surrounded by fencing. The fencing was removed and set aside. The shaft was backfilled with on- <br /> site rock and fill dirt. The backfilled area was mounded with 3-feet of fill dirt to allow for settling. A monument was <br /> installed and the NOI permit number was stamped into the cap. A straw waddle was placed on the downstream <br /> side for sediment control. The area was seeded and fertilized. <br /> Remaining Reclamation Requirements and Estimated Cost: No Remaining work is required. <br /> ALeA. Ccodn /17" <br /> Project Manager Senior J'° 't Manage <br /> 12 3H 1S- IS FR5 <br /> Date Date <br /> 1 <br />