My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-06-18_GENERAL DOCUMENTS - M1977400
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1977400
>
2015-06-18_GENERAL DOCUMENTS - M1977400
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 9:37:08 AM
Creation date
2/27/2023 9:23:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977400
IBM Index Class Name
General Documents
Doc Date
6/18/2015
Doc Name Note
Farmer Girl Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> BOND FORFEITURE PROJECTS <br /> Introduction: Farmer Girl reclamation constructed during October 2013 by RM2 LLC as part of multi-bond forfeiture project <br /> called Biscuit Rock which contained three other sites within the general Uravan, Colorado area. <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-1997-400 Bennett Mining Company Farmer Girl <br /> 1 Type of Mine— Decline Commodity Mined- UraniumNanadium <br /> PRE-RECLAMATION SITE CONDITIONS <br /> Previous reclamation work included installation of grated adit door at the portal and revegetation of waste rock pad area by <br /> DRMS project manager Paul Krabacher. Contractor Dirt-N-Iron completed reclamation in April, 1992. <br /> There still remained a small waste rock pile located in ephemeral drainage and the waste rock pile was sparse in vegetation <br /> and the steep slopes contained many rills and were in beginning in stages of gullying <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Reclamation work constructed as part of multiple Bond Forfeiture project called the Biscuit Rock awarded to RM2, LLC of <br /> Clifton, Colorado. The bid document included$4000.00 for bid items 6.1 —Farmer Girl Regrading: $2000.00/acre and 6.2— <br /> Farmer Girl Revegetation -$2000.00/acre. Mobilization ($4,000.00)and SHEAP($500.00)costs were shared between the <br /> four different Bond Forfeiture projects. Shared cost is$1,125.00/site. <br /> Type of Bid Invitation Formal - Bid as the Biscuit Rock Project, PKA-13-704 <br /> PO Number Contractor Name&Address Construction Bond Amount <br /> 1300000041 Dates $ 0 <br /> RM2, LLC Start: 10/18/2013 <br /> P.0 Box 1418 <br /> Clifton, Colorado 81520 <br /> PO Date End. 10/21/2013 Project Cost <br /> 4/24/2013 $5,125.00(FMS2) <br /> Construction Work Description <br /> The contractor, Mike Frick of RM2, LLC mobed a John Deere 310J rubber tired backhoe up the 2 miles of steep, narrow <br /> access road on 10/18/2013. In addition, RM2 mobed a 25 foot flatbed trailer with weed free certified mulch and trailer <br /> containing Biosol and seed. <br /> The work included in the bid document required 1 acre of regrading consisting of moving an existing 200 cubic yard waste <br /> rock pile from a dry wash to prevent transport of waste rock down drainage. The material was move approximately 200' to <br /> create a berm on the existing waste rock pile to prevent runoff from further eroding the steep siope of the existing waste rock <br /> pile. The bid document also included one acre of revegetation of the excavated waste rock area, the bermed area <br /> consisting of the excavated waste rock and bare areas of the existing waste rock pile. Revegetation included scarification <br /> with backhoe, hand spreading of native seed mixture and application of 400 lbs/acre of organic fertilizer Biosol. Certified <br /> weed free straw was applied at rate of 2 tons/acre and mulch was machine crimped. <br /> Remaining Reclamation Requirements and Estimated Cost <br /> No additional Reclamation Requirements exist, Energy Fuels Resources filed a Notice of Intent to conduct drilling of some <br /> test borings in 2013. <br /> 1) / 3) <br /> Pro.-ct Tanager Senior Project Manager <br /> 2.70///i G —/ / S <br /> Date Date <br /> As of 05/14/09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.