Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> BOND FORFEITURE PROJECTS <br /> Introduction: Return Mine reclamation constructed during October 2013 by RM2 LLC as part of multi-bond forfeiture <br /> project called Biscuit Rock which contained three other sites within the general Uravan, Colorado area. <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> P-2006-008 Beck Resources LLC Return Mine <br /> Type of Mine— Adit Commodity Mined— UraniumNanadium <br /> PRE-RECLAMATION SITE CONDITIONS <br /> Previous reclamation work was completed by permitee Beck Resources LLC and included backfilling the adit entry of the <br /> mine in summer 2010. Stormwater runoff controls were installed to include an interceptor drainage and catch basin with a <br /> separate smaller catch basin next to the road ditch. A waste rock repository was constructed on the eastern edge of the <br /> site. Little to no vegetation was established and the stormwater catch basin was in need of sediment removal. Additional <br /> riprap is needed in the stormwater drainages. The waste rock pile did not have any vegetation and was beginning to show <br /> signs of erosion. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Reclamation work constructed as part of multiple Bond Forfeiture project called the Biscuit Rock awarded to RM2, LLC of <br /> Clifton, Colorado. The bid document included$1,500.00 for bid items 5.1 -Return Mine Regrading and —$4000.00 for Bid <br /> Item 5.2- Return Mine Revegetation -2 acres at$2000.00/acre. Mobilization($4,000.00)and SHEAP ($500.00) costs <br /> were shared between the four different Bond Forfeiture projects Shared cost is$1,125.00/site. <br /> Type of Bid- Invitation Formal - Bid as the Biscuit Rock Project, PKA-13-704 <br /> PO Number Contractor Name &Address Construction Bond Amount <br /> 1300000041 Dates $ 7,815.00 <br /> RM2, LLC Start: 11/19/2013 <br /> P.O. Box 1418 <br /> Clifton, Colorado 81520 <br /> PO Date End. 11/24/2013 Project Cost <br /> 4/24/2013 $ 6,865.00 ($950.00 remains in bond) <br /> Construction Work Description <br /> The contractor, Mike Frick of RM2 LLC, mobed a John Deere 310J rubber tired backhoe from the Farmer Girl site to the <br /> Return site on 10/19/2013. RM2 had previously mobed a 25 foot flatbed trailer with weed free certified mulch and trailer <br /> containing Biosol and seed. <br /> The work began on 10/21/13 with cleaning out the existing stormwater catch basin by excavating approximately 2 feet of wet <br /> saturated sediment and spreading across the existing waste rock pile in an approximately 4"-6" lift to cover the entire waste <br /> rock area. The backhoe was used to construct 1 foot deep gouges spaced approximately 1 foot apart across the entire <br /> surface of the waste rock pile. The moist sediment removed from the catch basin provided a good seedbed and <br /> revegetation was completed. One hour additional equipment time was used to remove waste rock from a natural <br /> stormwater drainage on the eastern edge of the waste rock pile <br /> Additional work included armoring the existing drainage channel with large on-site rock, removal and widening of second <br /> smaller catch basin next to road ditch (additional hour of equipment time), and scarification of all areas devoid of vegetation. <br /> Revegetation included 1) scarification approximately 4"deep with backhoe bucket, 2)hand spreading of native seed mixture <br /> and 3)application of 400 lbs/acre of organic fertilizer Biosol and 4)mulching with certified weed free straw applied at a rate <br /> of 2 tons/acre and hand or machine crimping of mulch. <br /> Remaining Reclamation Requirements and Estimated Cost <br /> Vegetation maintenance may need to be accomplished in the future. <br /> As of 05/14/09 <br />