Laserfiche WebLink
s <br /> Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> BOND FORFEITURE PROJECTS <br /> Starr Placer <br /> Introduction: The Starr Placer Claim (#255) is located on private land approximately one-quarter (.25) mile southeast of <br /> Leadville, in Lake County, Colorado. The Notice of Intent to Conduct Prospecting Operations was filed on June 1, 1987. <br /> The Prospecting NOI was revoked and the bond money forfeited on October 7, 2004. <br /> The Starr Placer bond forfeiture was combined with the Luna Placer bond forfeiture and bid as the Starr-Luna Project <br /> (PKA-10-1188). <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> P-1987-039 Edward Jacobs Starr Placer <br /> Type of Mine - Placer Mine Commodity Mined - Gold <br /> PRE-RECLAMATION SITE CONDITIONS: Two (2) small catch ponds were excavated within the permit boundary, one (1) <br /> pile of stockpiled topsoil (approx. 200CY), a large framed structure fabricated with 1001b/yd rail and several piles of scattered <br /> debris are all present on the Starr Placer Claim. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid: Purchase Order Quote - Bid as the Starr-Luna Project, PKA-10-1188 <br /> PO Number: N/A Contractor Name &Address Construction Dates: Bond Amount: <br /> $ 5,359.00 <br /> (Direct Bill) McCollum's Excavating Start: July 23, 2010 <br /> P.O. Box 790 End: August 9, 2010 Project Cost: <br /> $ 1,524.00 <br /> Nederland, CO 80466 <br /> Construction Work Description: <br /> Both catch ponds were backfilled and the land regraded to blend with the surrounding contours. The stockpiled topsoil was <br /> spread evenly over all disturbed surfaces and roughened in preparation for revegetation. The rail structure and all other <br /> debris was removed from the property and disposed of in a licensed landfill. Revegetation included the application of Biosol <br /> Mix (7-2-3) fertilizer, Subalpine seed mix, and certified weed-free mulch. <br /> Remaining Reclamation Requirements and Estimated Cost: <br /> Additional revegetation including fertilizing, seeding and mulching is planned for this site. In addition, shrub propagation & <br /> live plantings would benefit the reclamation efforts at the Starr Placer site. <br /> Estimated cost= $3,835.00 <br /> 1) (/ .411,10r400" 3) <br /> Project Manager Senior Project Manager <br /> 7/.— ( G — ID <br /> Date Date <br /> 2) 4) L <br /> Grants Officer a)AMLIS (De/b) BrassCap(Yvonne;then to Kristin for filing) <br /> ti•I 7 to <br /> Date Date <br /> As of 05/14/09 <br />