Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-1982-049 Leland Lode Mining Idaho Mining District <br /> Type of Mine- Underground Commodity Mined- Gold <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Leland Lode#2 Bond Forfeiture consists of an access road and prospecting operation located in Idaho Springs <br /> immediately east of the Edgar Mine in Clear Creek County, Colorado. A mining and reclamation permit was issued to Leland <br /> Lode Mining in 1982 for 5 acres. The permit was revoked and the financial warranty forfeited by the State of Colorado in <br /> 2005. According to the mining plan, this operation was to include an access road, mine bench, and underground mine adit. <br /> The access road begins at the Edgar Mine access road and extends approximately 1400 feet east to a small mine bench. <br /> There are no signs of a portal or mining equipment and there is no evidence that underground mining ever took place at this <br /> prospect. The remaining reclamation on site using the forfeited bond money includes ripping and grading the mine prospect <br /> area, and revegetating areas that lack established and diverse vegetation including the access road. Previous reclamation <br /> was performed on site in 2006 under another forfeited site, Leland North P-1987-063. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Direct Bill <br /> (circle one) <br /> PO Number Contractor Name &Address Construction Bond Amount-$1,900.00 <br /> N/A Dates <br /> Berry Trucking and Excavating, Start: 6/24/2010 <br /> Inc. <br /> PO Date 8561 S. Ammons St. End: 6/25/2010 Project Cost <br /> N/A Littleton, CO 80128 $ 1,900.00 <br /> Construction Work Description <br /> Construction began on June 24, 2010 with equipment and materials being mobilized to the project site. Work started on <br /> prospect mine area where an existing timber pile was removed, and two small overburden piles were blended into the <br /> surrounding area. A small berm was constructed for sediment control purposes. Two (2)tons of certified weed free mulch <br /> per acre was applied to all disturbed areas and the access road. The areas were seeded with the Ponderosa <br /> Pine/Spruce/Fir seed mixture. A total of 0.5 acres were reclaimed. The total cost for this work was $1,900.00. <br /> The project was completed on June 25, 2010. <br /> Remaining Reclamation Requirements and Estimated Cost: <br /> There are no additional reclamation requirements for the Leland Lode#2 Bond Forfeiture Project. <br /> (to <br /> --,4111111161111111111.411110"-.. <br /> Project Manager enior ProjectT anager <br /> 23I 2O O -29-Jcic--2. 4 o <br /> Date Date <br />