My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-24_GENERAL DOCUMENTS - M2002086
>
Day Forward
>
General Documents
>
Minerals
>
M2002086
>
2014-11-24_GENERAL DOCUMENTS - M2002086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 10:22:50 AM
Creation date
2/27/2023 9:22:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002086
IBM Index Class Name
General Documents
Doc Date
11/24/2014
Doc Name Note
Aspen Gold Pit Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-2002-086 Ty Hawkins Aspen Gold Pit <br /> Type of Mine - Commodity Mined: Gravel <br /> PRE-RECLAMATION SITE CONDITIONS <br /> Open pit sandstone gravel pit, with 4 ft. high walls. Topsoil salvaged. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Documented Quote <br /> (circle one) orma - s the Aspen Gold Pit Bond Forfeiture Reclamation Protect, PKA- 14-1265 <br /> PO Number Contractor Name &Address Construction Bond Amount <br /> Dates $ N/A <br /> OE PKA 14000000073 Reams Construction CO Start: 7/15/14 <br /> P.O. Box 106 <br /> Naturita, CO 81422 <br /> PO Date: 6/19/2014 End: 7/18/14 Project Cost <br /> $21,775 + 1,485.51 =$23,260.51 <br /> Construction Work Description <br /> Reduce slopes of gravel pit to 3H:1 V or less steep and,distribute crushed rock and overburden over pit floor,creating <br /> positive drainage, as directed by PROJECT MANAGER. Distribute topsoil over slopes and floor, as directed by <br /> PROEJCT MANAGER. All areas disturbed during construction will be revegetated according to the Section 20, <br /> REVEGETATION Specifications in the General Bid Specifications, as directed by PROJECT MANAGER. DRMS will <br /> provide the seed for the project. <br /> Remaining Reclamation Requirements and Estimated Cost: N/A <br /> J _ <br /> Proj anager genior Project Manager <br /> 7k2-//i/ 2-4— <br /> Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.