Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> BOND FORFEITURE PROJECTS <br /> Introduction: The Sherman Mine had been inactive since 1985 and abandoned for at least 17 years. The mine buildings were <br /> either collapsed or in complete disrepair. The site was experiencing severe erosion and other environmental hazards and the <br /> overall site is considered dangerous and unsafe. CDRMS recalculated the bond and Leadville Corporation, Inc. was unable to <br /> post the required bond. Both US BLM and Colorado Mined Land Reclamation Board (CMLRB) found Leadville Corporation, Inc. <br /> in violation of the requirements of their permit, and the CMLRB terminated the permit and the bond was forfeit. <br /> Permit Information <br /> Permit Number: Operator Name: Mine Name: Sherman Mine <br /> M1977-249 Leadville Corporation <br /> Type of Mine— Underground Hardrock 112 Permit Commodity Mined: Lead and Silver <br /> PRE-RECLAMATION SITE CONDITIONS: Decaying mine site, with buildings in various stages of falling down. <br /> Transformers, powerline, boiler with asbestos, ice plug in portal, mine dump erosion. Site was reclaimed in 2007 and 2008. <br /> Large precipitation events and extremely fast erosion caused erosion and rilling. <br /> BIDDING/CONSTRUCTION INFORMATION: Pre-bid July 13, 2010, attended by 11 potential bidders. Bid opening on July <br /> 27, 2010, with 9 bids. The successful bidder was Dave's Enterprises, Inc. with a bid of$15,900.00. <br /> Type of Bid : Formal - Bid as the Sherman Repairs Project, PKA-10-635 <br /> PO Number: Contractor Name&Address: Construction Bond Amount <br /> OE-11000000013 Dave's Enterprises Dates $0.00 <br /> 49 2nd Street Start: <br /> Montezuma, Colorado 80435 August 18, 2010 <br /> PO Date: End: Project Cost <br /> August 13, 2010 August 23, 2010 $15,900.00 <br /> Construction Work Description: <br /> The project included widening the existing channel, excavating a catchment basin and ditch at the base <br /> of a steep drainage, re-grading and filling erosion rills, installation of culverts and allowing for the stream <br /> flow in two channels, and removal and disposal of trash. <br /> Remaining Reclamation Requirements and Estimated Cost: There will be a major reclamation effort in 2011 including <br /> energy dissipating structures in the main stream channel, and in the channel leading from the mine portal. <br /> 1) 3) <br /> Project anager Senior Proj4et Manager <br /> Date Date <br /> 2) 4) <br /> Grants Officer a)AMLIS (Deb)/ b) BrassCap (Yvonne; then to Kristin for filing) <br /> Date Date <br /> As of 05/14/09 <br />