r <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-1980-169 Colorado Gold and Silver, Inc. Fleece Ilma Mine <br /> Type of Mine-Hardrock Commodity Mined: Ag and Au <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Fleece Ilma Mine is located approximately 3 miles south of Lake City, Colorado, directly west of Lake San <br /> Cristobal. An application for Mining and Reclamation Activities, Limited Impact Operations permit was issued to <br /> Colorado Silver and Gold, Inc. in 1980. The mining permit was revoked and the financial warranty forfeited by the <br /> State of Colorado in 2001. Preliminary reclamation work was done by DRMS in 2005, using the approximately <br /> $1,000.00 forfeited bond. Pre-reclamation site conditions included a partial adit closure, which had been tunneled around <br /> by visitors to site, and uncontrolled, metals laden mine drainage which flowed over the access road, through the dump, and <br /> into a wetland adjacent to County Road 30 and Lake San Cristobal. During high flows in the spring, the adit drainage would <br /> flow through a culvert and into Lake San Cristobal, creating a red plume in the lake. The adit was closed and the adit <br /> drainage was diverted to a series of settling ponds during reclamation of the site which was completed in October 2009. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> This maintenance was completed as a Direct Bill Project <br /> Type of Bid PKA-10-1161 <br /> (circle one) DIRECT BILL <br /> Contractor Name &Address Construction <br /> Dates Bond Amount: $0 <br /> High Country Equipment Start: 06/04/2010 Severance Tax <br /> 36356 Highway 92 End: 06/04/2010 $2,760.00 <br /> Hotchkiss, CO 81419 <br /> Project Cost <br /> $2,760 <br /> Construction Work Description <br /> High Country Equipment mobilized to the site on June 4, 2010. The channel conveying adit water from the previously placed <br /> HDPE pipe was reconstructed to be wider and deeper than originally built. The door hinges were replaced and the lock hasp <br /> was made smaller to reduce door movement. All construction was completed on June 4, 2010. <br /> Remaining Reclamation Requirements and Estimated Cost <br /> NONE • <br /> J <br /> 1 / <br /> Project Manager Senior Project Manager <br /> qiick9.610 7 - 2� - /v <br /> Date Date <br /> 2) 4) <br /> Grants Officer a)AMLIS (Deb)/b) BrassCap(Yvonne;then to Kristin for filing) <br /> Date Date <br /> As of 05/14/09 <br />