My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-25_GENERAL DOCUMENTS - P1983091
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P1983091
>
1997-09-25_GENERAL DOCUMENTS - P1983091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 9:53:13 AM
Creation date
2/27/2023 9:21:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P1983091
IBM Index Class Name
General Documents
Doc Date
9/25/1997
Doc Name Note
Redwing Lode Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> P-83-091 Colorado Development Corp. Redwing Lode <br /> • <br /> Type of Mine-Underground Commodity Mined-Gold/Silver <br /> PRE-RECLAMATION SITE CONDITIONS-The mine site,which dates from 1890,was used by Colorado Development Corp.for <br /> promoting a stock scam. The waste dump associated with the main shaft had been moved around into many small piles for <br /> photographic purposes, and water draining from the shaft was flowing over and eroding various portions of the dump. Waste dumps <br /> associated with two adits had also been disturbed,with some waste material ending up in the creek. Portions of the creek channel <br /> had also been disturbed and the creek was not in its original channel. Mining derbis,including a pickup truck,was strewn around the <br /> main shaft and around two man made ponds near the creek. A road had been cut up the east face of the main waste dump and the <br /> resulting erosion had deposited considerable material in the creek,much of which had already been washed downstream. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Documented Quote <br /> (circle one) Formal - Bid as the Georgia Pass Project,PICA-8-399 <br /> PO Number Contractor Name&Address Construction Dates Bond Amount <br /> Dirt-N-Iron Start:9-21-1997 $5600.00 <br /> 1685 17 Road <br /> Loma,Colo.81524 <br /> PO Date End:9-25-1997 Project Cost <br /> $9344.00 <br /> Construction Work Description-To maximize use of the bond money,AML funds were used to safeguard the eligible pre-law features <br /> ,namely the shaft andtwo adits. The main shaft was safeguarded by constructing a grate with a spread footer;the adit near the creek <br /> was backfilled;and a bulkhead with a suitable drain was constructed in the draining adit. A large portion of the waste clump in the <br /> creek was removed and incorporated into the main waste dump from the shaft. The main dump was consolidated slightlywest of the <br /> creek and re-graded to minimize erosion. A ditch was constructed to divert drainage from the shaft around thewas-te dump. Derbis <br /> was removed from the creek and the channel returned to its approximate original position. The two man-made ponds were not <br /> disturbed at the request of the U.S.F.S. All mining related trash including the pickup truck were removed from the site. All-disturbed <br /> areas were seeded and mulched after regrading. The road on the dump and leading into the site were removed and large boulders <br /> placed across the entrance to the site. <br /> Remaining Reclamation Requirements and Estimated Cost-- None <br />
The URL can be used to link to this page
Your browser does not support the video tag.