Laserfiche WebLink
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-81-248 K T Mining Co. K T Mine <br /> Type of Mine—Underground/Mill Commodity Mined—Copper <br /> PRE-RECLAMATION SITE CONDITIONS—One adit, one shaft and two exploration shafts, waste piles, mill, acid-containing <br /> tanker, many buildings and house trailers, great volumes of metallic and non-metallic debris. Most of the reclamation was <br /> completed in 1998. 1999 conditions included scattered metallic debris and burnt piles of debris. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Documented Quote <br /> (circle one) Formal - Bid as the K T Mine Project, PKA-9-1055 <br /> PO Number Contractor Name&Address Construction Dates Bond Amount <br /> 99000000006 Start: 10/21/99 $1,250.00 <br /> Dirt-N-Iron, Inc. BLM contributed $18,000.00 <br /> 1685 17 Road <br /> Loma, CO 81524 <br /> PO Date End: 10/22/99 Project Cost <br /> 8/21/98 $19,250.00 <br /> Construction Work Description—See 1998 report for 1998 work summary. 1999—BLM has buried remaining buildings. <br /> Contractor cut and removed remaining metallic debris from public lands. Concrete debris, buried on site. Regraded seeded <br /> and mulched. Erosion control practices completed. <br /> • <br /> Remaining Reclamation Requirements and Estimated Cost— Remaining reclamation on private lands was not completed at <br /> owner's request. If undertaken, reclamation would include structural demolition, safeguarding shaft, debris removal, grading, <br /> soiling dump. Estimated cost: $75,000.00. <br />