Laserfiche WebLink
TASK 5: INSTALL CONCRETE PIPE <br /> Two concrete pipe sections must be installed over the grated concrete panel so the steel grate <br /> is centered in the pipe. The concrete pipe sections are five feet in diameter, and are located <br /> across from the Central Station Casino parking lot on the Miners Mesa road. After installation <br /> of the pipe sections, the panels must be backfilled to the pre-construction contours. <br /> Measurement and Payment <br /> No measurement for payment shall be made for this bid item. Payment shall be for the lump <br /> sum bid price. The bid price shall include all of the CONTRACTOR's costs of whatever nature <br /> to provide for complete installation in accordance with the plans and specifications. <br /> Return by October 2, 1997 at 2:30 p.m. to: <br /> Yvonne Brannon <br /> 1313 Sherman St., #215 <br /> Denver, CO 90203 <br /> fax (303) 832-8106 <br /> 4 <br />