My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-03_GENERAL DOCUMENTS - M1990049 (2)
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1990049
>
2008-12-03_GENERAL DOCUMENTS - M1990049 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 9:31:42 AM
Creation date
2/27/2023 9:21:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990049
IBM Index Class Name
General Documents
Doc Date
12/3/2008
Doc Name Note
Druid Mine Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number Operator Name Mine Name <br /> M-1990-049 & Solution Gold, Ltd. Druid Mine <br /> M-1992-090 <br /> Type of Mine—Surface Commodity Mined-Gold <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Druid Mine permits were revoked and bond forfeited in 1994. Reclamation was completed by the IMP in 1995. Since <br /> that time, the mine has been classified a Superfund site and the property has been purchased by the Colorado Department <br /> of Public Health and Environment (CDPHE). CDPHE is in the process of consolidating mine waste in the are into a mine <br /> waste consolidation area. DRMS will contribute to the reclamation of the site by moving material from the Kokomo portion of <br /> the Druid mine into the consolidation area in 2009. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid <br /> (circle one) Direct Bill: Druid Mine M-1990-049 & M-1992-090 <br /> PO Number Contractor Name &Address Construction Bond Amount <br /> McCollum Excavating Dates $ 714.00 <br /> Start: 11/20/2008 <br /> PO Date PO Box 790 End: 11/20/2008 Project Cost <br /> Nederland, CO 80466 $ 714.00 <br /> Construction Work Description <br /> The remaining bond money in the amount of$714.00 was used to dig test holes and trenches at the Kokomo site to <br /> determine the depth of the tailings material. Thirty(30)test holes were dug over the 1 acre site using a large excavator. <br /> Once the depth of the material was determined, the holes were backfilled. See attached map for further detail. This <br /> information will be used to determine the volume of material to be moved into the CHPHE repository in 2009. <br /> Remaining Reclamation Requirements and Estimated Cost- $100,000.00 (Severance Tax Funds) <br /> Material from the Kokomo site will transported into the CDPHE Waste Consolidation Area in 2009 under an Interagency <br /> Agreement. The Kokomo site will then be treated with lime and other soil amendments and reseeded. <br /> 114Project Manager S= +:r Project Manager <br /> 1'214)M Dc_z---08 <br /> Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.