Colorado Division roject of Reclamation, Summary
<br /> Mining & Safety
<br /> Gold King Permanent Portal Discharge Diversion Structure
<br /> 2008 Bond Revocation Construction
<br /> TV In 2008, DRMS took action and halted the saturation of the
<br /> 1 . Y ' Level 7 mine waste pile. DRMS met with Todd Hennis,
<br /> landowner, and settled on moving the ditch to an eastward
<br /> t. tt. 't\` flowing direction and lining the ditch with half round HDPE
<br /> 1 P
<br /> pipe. The location of the ditch is ideal for both long term
<br /> Ili*" ' II- . - closure of the site and any future mining activity.
<br /> DRMS contracted Maisel Excavation from Silverton,
<br /> - Colorado to complete the construction work. Maisel
<br /> Excavation was familiar with the mine site because they had
<br /> . -. .r!tia . been working on other construction items on the site for the
<br /> landowner.
<br /> ,, - The project was constructed during the week of August 25,
<br /> Oill' , 2008. The new permanent portal discharge diversion
<br /> ` structure was excavated into the top of the mine waste and
<br /> 2007 Saturated Mine Waste and breached ditch 165 foot of half round 36"diameter corrugated pipe was set
<br /> at a 2-3%grade.
<br /> 2008—Installation of permanent portal discharge diversion structure
<br /> aC
<br /> .....-4 „,„,:?,r1,---4--.,,--..1.1.-- „„r.::::;:r ,::-...."-_,t,,-; .-•-• '-
<br /> 4.f .litf"''.....,,f-,..!-:_a-,...„; 4..---;,T; „ .:;.----..,,i-. r7.:=...t.,;.=-."-- 1'7 1. - _ .i:., :::,.._.,... .,.., ::::: , ,,,y.,,,.s..)ttz.1,,,.,t. -,_4 :::,' .
<br /> ' ter. d _
<br /> ,fi`a t , j '-'r ��` aty"F`yi► Z. xy, ..X '
<br /> .t «!.�;.w•. ,,, °u" tr -_.. -•t^a. `Z yr: i :'t.�'. t;.s`.
<br /> m
<br /> 2007 Slope Failure . : �, 7. ,...:tt:"..'- ,
<br /> i
<br /> �w.. �`� air.,,c
<br /> Remaining Reclamation Requirements
<br /> The remaining reclamation requirements for the Gold King bond F4„ :
<br /> forfeiture are the closure of four portals, two at the Level 7, one '�
<br /> „; ti:�
<br /> at the Sampson Portal, and one at the Level 1 Portal. The ,',41•01,., -4:4.z!,.....,-„,.. _
<br /> diversion structure at the Level 7 will be maintained under a . ,,,� .�,
<br /> future project and the mine waste at the Level 7 will be graded to -•- -... `
<br /> 3% to allow for positive drainage. The estimated cost of the - 4.,. .- ?_
<br /> remaining reclamation requirement is$37,000.00. -,) .,' z' *4,4 ` .":,.+,,,r`