My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-25_GENERAL DOCUMENTS - M1987037
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1987037
>
2013-08-25_GENERAL DOCUMENTS - M1987037
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 9:00:10 AM
Creation date
2/27/2023 9:21:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987037
IBM Index Class Name
General Documents
Doc Date
8/25/2013
Doc Name Note
Sleepy Jim Tunnel Closeout-BF
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Inactive Mine Reclamation Program <br /> CLOSEOUT REPORT <br /> ACTIVE MINE BOND FORFEITURE PROJECTS <br /> Permit Information <br /> Permit Number: Operator Name: Mine Name: <br /> M- M-87-037 Conley Construction Sleepy Jim Tunnel <br /> Type of Mine: Underground Adit Commodity Mined: Gold and silver <br /> PRE-RECLAMATION SITE CONDITIONS <br /> The Sleepy Jim Tunnel was a small gold and silver mine located about 2 miles south of Cripple Creek on the <br /> east side of the Shelf Road. An exploration adit (15 feet wide and 10 feet high) was mined between 1987 and <br /> 1989. The Division revoked the permit and forfeited the bond in 1999 and CDRMS retained Conley Construction <br /> to backfill the adit in November, 2000. <br /> In 2013, personnel from Cripple Creek & Victor Mining Co. (CC&V) observed a crown hole above the backfilled <br /> portal area. DRMS inspected the site in July 2013 and developed a scope of work to excavate the crown hole, <br /> backfill the opening, install a diversion dike above the portal, and re-seed the site. <br /> BIDDING/CONSTRUCTION INFORMATION <br /> Type of Bid Documented Quote Purchase Order <br /> (circle one) Invitation for Bid CD.is. rchase <br /> PO Number: Contractor Name & Address: Construction Bond Amount <br /> Dates: $ 1,812.00 <br /> Conley Construction <br /> 3170 Sunrise Circle Start:8-25-2013 <br /> Canon City, CO 81212 <br /> Date End: 8-25-2013 Project Cost: $ 1,812.00 <br /> Construction Work Description <br /> Conley Construction completed the reclamation in August 2013. The Division inspected the site on August 30, <br /> 2013 and determined the reclamation to be satisfactory. <br /> Remaining Reclamation Requirements and Estimated Cost: No Remaining work is required. It is <br /> recommended that this site be monitored periodically. <br /> 11 1 jYti` / ' <br /> Project Manager Senior '/fit Manager <br /> Sleepy Jim Tunnel (July-August 2000) <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.