My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-02-24_HYDROLOGY - M2004009 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2004009
>
2023-02-24_HYDROLOGY - M2004009 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 10:37:43 AM
Creation date
2/27/2023 7:32:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004009
IBM Index Class Name
Hydrology
Doc Date
2/24/2023
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
ECS
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASCI Turnpike Mining Resources SWSP Page 3 of 7 <br /> February 24, 2023 <br /> Dewatering <br /> Groundwater will be pumped from the pump basins and discharged directly to Boulder Creek from Cells 5 <br /> and 6. The total amount of water anticipated to be dewatered is 112.27 acre-feet during this SWSP <br /> period, as shown on Table 4 (attached). <br /> Total Consumptive Use <br /> The total consumptive use at this site during 2023 will be 125.2 acre-feet, which includes 11.18 acre-feet <br /> of net evaporative loss, 1.76 acre-feet/year of water used for dust control, and 112.27 acre-feet/year of <br /> water from dewatering. <br /> Lagged Depletions <br /> The IDS AWAS stream depletion model was used to determine the lagged depletions from previous <br /> evaporation, operational losses, and dewatering to Boulder Creek in Cells 2A, 213, 3*, 4*, 5 and 6. The <br /> aquifer characteristics used in the model are as shown in the following Table B using the alluvial aquifer <br /> boundary condition. <br /> Table 8: IDS AWAS Parameters <br /> Cell Transmissivity Specific Yield (%) W, distance to X, distance to <br /> (gpd/ft) boundary ft stream ft <br /> 2A and 2B 44,883 20 3,400 3,050 <br /> 3* 44,883 20 3,400 1,065 <br /> 4* 44,883 20 1,350 275 <br /> 5 and 6 44,883 20 1,350 600 <br /> *Remaining lagged depletions due to mining and dewatering activities during previous SWSP period. <br /> Lagged depletions due to dewatering are as follows: <br /> 1. 11.47 acre-feet for Cells 2A and 2B (evaporation from the wash pond and settling pond, and dust <br /> control), <br /> 2. 0.3548 acre-feet for Cell 3 (previous mining activity and dewatering), <br /> 3. 0.0026 acre-feet for Cell 4 (mining, dewatering, and evaporation from the pump basin and <br /> dewatering trench), and <br /> 4. 114.03 acre-feet for Cells 5 and 6 (mining, dewatering, and evaporation from the pump basin and <br /> dewatering trench). <br /> The total lagged depletions for 2023 are equal to 125.85 acre-feet (Table 5 and Table 6, attached). <br /> For purposes of this SWSP the point of depletion for the gravel mining operation shall be on Boulder Creek <br /> where Boulder Creek crosses the north line of Section 31, Township 2 North, Range 68 West, 61h P.M. <br /> Replacements <br /> Out-of-priority depletions associated with the mining operation at this site will be replaced using fully <br /> consumable municipal return flows leased from the City of Louisville and with excess water returned from <br /> dewatering after lagged dewatering depletions are replaced on a monthly basis. <br /> A copy of the lease with this City was provided to this office on February 13, 2023 and is attached to this <br /> letter. The current lease is valid for the period of January 1, 2023 through December 31, 2023 therefore <br />
The URL can be used to link to this page
Your browser does not support the video tag.