Laserfiche WebLink
Page 18 <br /> 6.4.4 EXHIBIT D — Extraction Plan <br /> mobility within the active areas of extraction, processing; and correlated need <br /> for transportation of human resources, equipment, and product. Human <br /> resources for operations, heavy equipment, and haul traffic will occur based <br /> upon the desired and dynamic activities necessitated by time and <br /> circumstance within the designated Fields. Access points for continued <br /> agricultural, extraction, and plant site operations are shown X on Exhibit C-2: <br /> Extraction Plan Map, as follows (NOTE: Access purpose and usage may change <br /> in time from that indicated here-in. Also, General Existing Dimensions and <br /> length of existing access roads are represented in the aerial images on the <br /> Exhibit Maps relative to the Access locations detailed, below. Modifications <br /> may occur as needed and will be reported in OMLR Annual Reports.): <br /> * Entrance 1: Farmstead entrance. Limited Access. Note: Visitors will first access operations <br /> by checking in at an established plant scale-house, not here. <br /> Entrance 2: Primary Access to the lower boundary of Central Field. <br /> Entrance 3: Primary Western Access to the North-West Field. <br /> Entrance 4: Primary Eastern Access to the Wash Pond and designated Plant Site. <br /> Entrance 5: Adjacent Parcel Existing Access. <br /> Entrance 6: Oil &Gas Access into the Western Section of Central Field. <br /> Entrance 7: Primary Eastern Access to the North-West Field. <br /> Entrance 8: Primary Northern Access to Central Field. <br /> Entrance 9: Primary Northern Access into the designated Plant Site location. <br /> Entrance 10: Internal Access from Adjacent Lands. <br /> Entrance X—Agricultural/Mechanical <br /> Entrance WV—Agricultural/Mechanical—Westervelt R-O-W Access to adjacent Wetland Bank <br /> Existing roads outside of the permit boundary are shown on Exhibit C-l: <br /> Existing Conditions Map. Existing on-site internal access roads are also visible <br /> to scale in the aerial information provided under Exhibit C-2: Extraction Plan <br /> Map and other map exhibits included with this submittal. In general, <br /> Operations will predominantly utilize unmodified existing <br /> agricultural field access roads (unless otherwise indicated), which will <br /> themselves be subsequently extracted in time where they fall within the <br /> extraction limits shown on Exhibit C-2: Extraction Plan Map. No other defined <br /> roads within the Extraction Limits will occur except for the temporary paths <br /> created by extraction equipment, or otherwise determined by subsequent <br /> Revision to the permit. <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />