Laserfiche WebLink
Page 122 <br /> 6.4.4 EXHIBIT D — Extraction Plan <br /> Plant Site Development & Operations: Plant operations are generally <br /> comprised of portable equipment. A small wash pond will be established near <br /> the onset of extraction operations as shown in Exhibit C-2: Extraction Plan <br /> Map. Deposit materials are predominantly transported or conveyed from the <br /> extraction areas to the plants or surrounding yard, where subsequently <br /> processed and scaled for sale. Pit-run (unprocessed materials) may also be <br /> loaded and transported directly from the extraction areas to area markets as <br /> needed and where appropriate. Plant Site operations may also receive and <br /> process materials, and utilize fresh water supply, sourced from locations <br /> outside of the permit area or planned areas of extraction. Provisions for a <br /> material processing plant may at some point be joined by complementary <br /> processing that may include periodic use of on-site recycling facilities. <br /> While recycling activities may occur within the approved plant site/stockpile <br /> location; concrete and/or asphalt batch plant facilities and locations are not <br /> presently determined or sought at the time of this submittal. Due to the <br /> extended life of the mine the Operator desires an essential flexibility to <br /> complement future area needs according to permit requirements and <br /> approvals applicable at the time should such facilities be sought. Any facility <br /> development of this kind will be determined at that time as identified in a <br /> later Technical Revision to the OMLR under the approved permit. These <br /> potential activities are mentioned here solely for purposes of transparency in <br /> establishing these activities as acceptable, normal, and necessary activities to <br /> meet and facilitate the delivery of essential construction material needs of the <br /> area which may occur over time during the life of the approved OMLR <br /> Construction Materials Permit Operations. <br /> WASH POND <br /> J ` si pir <br /> Ir <br /> Initial Plant Site Theater as seen in Exhibit C-2: Extraction Plan Map <br /> VARRA COMPANIES, INC. TWO RIVERS SAND GRAVEL AND RESERVOIR PROJECT MARCH 2O22 <br /> A REGULAR IMPACT[1121 CONSTRUCTION PERMIT APPLICATION-COLORADO DIVISION OF RECLAMATION MINING&SAFETY <br /> OFFICE OF MINED LAND RECLAMATION <br />