Laserfiche WebLink
AWES, LLC <br /> • Periodic assessment of measurement data accuracy, precision,and completeness; <br /> • Results of performance audits; <br /> • Results of system audits; <br /> • Significant QA/QC problems and recommended solutions;and <br /> • Resolutions of previously stated problems. <br /> 5.0 REMARKS <br /> The scope of work is based upon current available information and our understanding of this project. As the <br /> project develops, changes to the project scope of work may be required. If changes in the scope of work are <br /> dictated by the needs of the project,these changes will be presented prior to implementation. <br /> This Groundwater Monitoring Plan was prepared by AWES, LLC. <br /> Date <br /> Joby L.Adams, P.G., REM <br /> Pri nci pal/Hyd rogeol ogist <br /> 4 <br />